23 Nov 2025
Case Studies

How Children’s O&P Kept Their Independence and Patient-First Mission with ORTIS™

Children’s O&P was on a mission to remain a small, patient-focused, independent practice but rising demand was taxing on their team of six. Each brace was being hand cast in plaster and took 2–3 hours. Staff often worked late, enduring cracked hands, ruined clothes, and stressful turnaround times. They needed to move away from hand cast plaster and embrace automation to keep up.

Why ORTIS™ Worked for Children’s O&P:

Cleaner Work Space:

The foam carving process is cleaner, lighter, and more precise, producing molds that fit consistently.

Streamlined Production:

With ORTIS™ their workflow now runs from scan to carve to finished mold in about 45 minutes. Previous hand casting plaster would take 2-3 hours to dry before moving on to the next steps of production.

Reliable Support:

Fast, responsive service that keeps production moving.

 

 

“Support has been phenomenal — exceptional, exceptional, exceptional.”
Brendan Rooney, President at Children’s O&P

 

The Breakthrough:

With the same team, they were able to triple their outputs.
Automation doesn’t have to mean getting bigger. With ORTIS™, Children’s O&P transformed their workflow without compromising their mission of patient-focused production.

Read the Full Story

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.